
| Frame production started |
| Sunday, 26 February 2012 22:26 | |||
|
The frame manufacturing started on Friday the 24th of February. The first step was to laser cut the frame tubes. This way of cutting should increase the frame quality. The laser cutting we chose the MRB company from Sazovice. The proper cutting operation was done in Kroměříž.
The cutting program is based on our 3D models. The ends of the tubes were results of a few next hours of manufacturing. The next step of the frame production is the TIG welding that goes on in next two weeks in Prostějov at the Jaguar-Tomasek company.
|
Copyright © TU Brno Racing 2010. Powered by Joomla! Designed by Joodesign. ![]()